start your project with us today
Our Clients
All our products are built to conform to internationally acceptable standards with certifications from Standard Organization of Nigeria [SON] and International Electrotechnical Commission[IEC].
Our Product Installations
Anambra State
- 800A LV panel & Sub-panels installed at Next Century Hotel ,Nnewi.
- 1250A manual changeover panel installed at Roban Stores ,Nnewi
- 630A lV panel & Sub-panels installed at Dabara Hotels Ltd ,Nnewi.
- 800A LV panel & Sub-panels installed at chief Innocent chukwuma country home ,Nnewi.
- 630A LV panel & Sub-panels installed at seaman residence ,nnobi.
- 1250a LV panel & Sub-panels installed at unizik power house ,awka
- 800A Lv panel & Sub-panels installed at Munich classical Ltd ,Nnewi
- 400A lv panel & Sub-panels installed at unizik agulu campus
- 1250A manual change over panel & Sub-panels installed at nnewi hotel and suites,nnewi
- 630A LV panel & Sub-panels installed at golden nuggets hotel,nnewi
- 800A LV panel & Sub-panels installed at immaculate heart hospital sisters quarters,nkpor
- 630A LV panel & Sub-panels installed at bishop’s court assumption cathedral,nnewi
- 630A LV panel & Sub-panels installed at Odumegwu ojukwu university,igbariamA
- 400 LV panel & Sub-panels installed at engineering complex unizik awka
- 400A LV panel & Sub-panels installed at male hostel unizik ,awka
- 800A LV panel & Sub-panels installed at beautiful gates hotel and suites ,awka
Imo State
- 800A LV automatic mains failure panel & Sub-panels installed at Bon tripod hotel , owerri.
- 800A LV panel & Sub-panels installed at federal medical centre , owerri
- 400A Lv panel & Sub-panels installed at top rate hotels and suites, owerri
- 400A LV panel & Sub-panels installed at alvan ikoku federal college of education, owerri
- 800A LV panel & Sub-panels installed at eastern emirates Hotels and suites, owerri
- 1250A LV panel & Sub-panels installed at Bencons Hotels and towers, owerri
- 1250A V panel & Sub-panels installed at male hostel complex FUTO,owerri
- 630A LV panel & Sub-panels installed at frontline assembly cathedral church, owerri
- 400A LV panel & Sub-panels installed at skill acquisition centre , owerri
- 400A LV panel & Sub-panels installed at E-Digital library complex ,FUTO, Owerri
- 2000A LV panel & Sub-panels installed at foundry complex FUTO, owerri
- 630A LV panel & Sub-panels installed at anglican church cathedral, kato, Owerri
- 800A LV panel & Sub-panels installed at owerri shopping mall
- 400A LV panel & Sub-panels installed at imo state secreterial complex
- 1600A LV panel & Sub-panels installed at hotel de-Lapaix,aba.
Enugu State
- 1600A LT Auto reclosure (Smart feeder pillar) installed at transtel Ventures ,Enugu
- 250A LT Auto reclosure (Smart feeder pillar) installed at ,Enugu
- 400A LT Auto reclosure (Smart feeder pillar) installed at Malta bread ,Enugu
- 20Nos 4 Ways/800A feeder pillar supplied to enugu electricity distribution company,enugu
- 1250A manual change over panel & Sub-panels installed at roban stores ,enugu
- 1250A LV panel & Sub-panels installed at Nigeria Breweries PLC,Udi (th Mile ,Enugu
- 1000A manual change over panel & Sub-panels installed at hansas clinics ,enugu
- 1250A manual changeover panel & Sub-panels installed at golden village hotel,uwani,enugu
- 1250A LV panel & Sub-panels installed at water rehabilitation plant UNN,enugu
- 1250A manual changeover panel & Sub-panels delivered to jendiks nigeria Ltd
- 630A LV panel & Sub-panels installed at enugu state college of education.
Edo State
- 100Nos 800A 4-way feeder pillar manufactured and supplied through sam $ sam international agencies benin to EDOREB
Akwa Ibom State
- 60Nos 800A 4-way feeder pillar manufactured and supplied through jackinjay ltd to ministry of public utility,uyo
- 600A LV panel & Sub-panels installed at Ibom Hotels,uyo.
Bayelsa State
- 300Nos 800A 4-way feeder pillar manufactured and supplied to bayelsa State Rural Electrification Board,Yenongoa.
Bauchi State
- 200Nos 800A 4-way feeder pillar manufactured and supplied to Prutano Nig-Ltd for bauchi state Rural Electrification Board.
Delta State
- 1250A manual changeover panel & Sub-panels installed at roban stores, asaba
- 800A lV panel & Sub-panels installed at spring hill hotel & suite,asaba
- 1600A LV panel & Sub-panels installed at hamton towers hotel, asaba
Rivers State
- 100Nos 800A 4-way feeder pillar manufactured and supplied to Rivers State Rural Electrification Board,
Abuja
- 800A/4ways LT Auto-recloser (smart feeder pillar) installed at 500KVA 33/0.415V substation air-Rufai bus stop ,Kubwa, Abuja
- 30Nos 800/4ways feeder pillar supplied to mogabs Nigeria ltd ,abuja
- 20Nos 630A LT auto-Recloser(smart feeder pillar) supplied to abuja electricity distribution company, AEDC abuja
- 100Nos Rowtina AI smart module supplied to abuja electricity distribution company, (AEDC) abuja
- 1250A LV panel & sub-Panels installed at National war college (NWC) abuja
possitive feedback
client satisfaction
In search of protective equipment to reduce high rate of failure of Distribution Transformers , we deployed LT Auto reclosure produced by Rowtina Switchgears in our networks and the results has been marvelous and impressive.
Enugu Electricity distribution company
Integrating and Deploying Rowtina Ai Smart modules and LT Auto reclosures has adversely increase the stability in our Networks. Our substations are fully Automated , sytematically controlled and Monitored remotely. Stability of supply in problem arears has been improved.
Abuja Electricity Distribution Company
Having solved our problems with your Smart Low voltage Electrical Control panels, we are pleased to inform you that that your rating in all above parameters is Excellent and you fall in our "Preferred Vendor" category. we hope that in future also, you will continue to maintain the same performance and spirit
Roban Stores